Björkliden, wind farm, Närpes
7/2022–10/2023
7 wind turbines: turbine foundations. Infrastructure construction: tree removal and sale, roads, lifting areas, medium-voltage 33 kV cabling for the wind farm’s intranet, high-voltage 110 kV cabling for transition network, telecommunications, 110/33 kV substation.