Metsä Fibre, Bioproduct mill’s wastewater treatment plant, Kemi 

9/2021–2/2023

KSBR carried out the concrete casting for the wastewater treatment plant at Metsä Fibre’s Kemi bioproduct mill, part of Metsä Group. 

The contract included on-site casting of four massive pools, the largest of which was over 100 metres in diameter and nearly 12 metres high. In addition, we built a number of structures related to wastewater treatment. Earthworks were also included in the unit price contract.  

Formwork 46,600 m3, iron 3,255,000 kg, concrete 29,000 m3, rebar 270,000 rm, backfilling 75,000 m3 (theoretical volume).  Read more about the project here