OX2 Lestijärvi, wind farm BoP/ss, Lestijärvi
4/2022–6/2024
69 wind turbines. Tree removal, foundations, infrastructure construction, roads, lifting areas, cabling, telecommunications, three 100 kV substations and a 400 kV substation.