Vestia Oy, Seepage retention basin, Ylivieska
6/2025 – 10/2025
KSBR completed the construction of a seepage water retention basin for Vestia on a tight schedule. Work began in the summer of 2025, and the project was completed in early October of the same year. The contract included the construction of an 1,800 m³ retention basin, which was asphalted in two layers. A vehicle barrier was installed around the basin, and all the necessary piping and pump stations were also constructed. KSBR was also responsible for area lighting and electrification.
The success of the project stemmed from precise scheduling, smooth cooperation with the client, professional management, and personnel expertise. As a result, Vestia received a high-quality, reliable solution that meets demanding environmental and technical requirements.