Winda Energy, Hallakangas wind farm, Kyyjärvi 

6/2021–10/2022

KSBR implemented the infrastructure for the 8-wind-turbine farm in Kyyjärvi for Winda Energy. The project was carried out as a fixed price contract and included the construction of roads, lifting areas, cabling, the substation and generator transformer. Read more about the project here